Azure Migration
- After test migration is successful, we can migrate
- Once the migration is complete in the destination resource group, you should have a vm with the settings configured (target settings)
- Test if the server is migrated completely and stop replication.
Database Migration
- High level workflow
Source (On-prem simulation) – Microsoft SQL Server
- Create a Windows Server 2016 with 2 vcpus and 8 GB of RAM
- Login into the windows server
- Follow the installation steps of Microsoft SQL Server as discussed in the classroom.